Company History

  • 2003 Established Taipei main office

  • 2004 Established Dongguan plant

  • 2007 Introduced CNC lathe process

  • 2008 Introduced CNC Cross-cutting process

  • 2011 Introduced Soldering process

  • 2012 Introduced Stamping process

  • 2015 ISO14001 and ISO9001 certified

  • 2016 Introduced the ERP system

  • 2017 Introduced DC Fan production line

  • 2018 Taipei main office moved to Xizhi U-Town building

  • 2019 Established Subei plant

  • 2020 Subei plant put into operation